Black Box IC109A-R2 Manuel d'installation Page 139

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 164
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 138
13363230-216-229-B1
3
© 2007 Schneider Electric. All Rights Reserved.
Commissioning
Checking Sepam™ B80
Additional Voltage
Input Connections
Block Diagram
DE51259
* Detection of Plugged Connector (required for proper operation. Installed manually)
Procedure
Use the diagram above to perform the following steps
1 Turn the generator on.
2 Apply a voltage VN set to the rated secondary voltage of the additional VT
(V’
Ln
s = V’
LLs
/ 3).
3 Use the SFT2841 software to check that the measured voltage indicated V’an or
V’ab is approximately equal to the VT's rated primary phase-to-neutral voltage
(V’
Ln
p = V’
LLp
/ 3).
4 Turn the generator off when testing is complete.
Van
Vbn
Vcn
Vr
a
b
c
Vue de la page 138
1 2 ... 134 135 136 137 138 139 140 141 142 143 144 ... 163 164

Commentaires sur ces manuels

Pas de commentaire