MCS025
Sync-Check Module
Connection Diagram
DE52075
(1) Phase-to-phase or phase-to-neutral connection.
CAUTION DANGER
HAZARD OF NON-OPERATION
The MCS025 module must ALWAYS be
connected with the special CCA785 cord,
supplied with the module and equipped with an
orange RJ45 plug and a black RJ45 plug.
Failure to follow this instruction can cause
equipment damage.
HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH
b Only qualified electrical workers should install this equipment. Such work
should be performed only after reading this entire set of instructions.
b NEVER work alone.
b Isolate the temperature sensors from dangerous voltages.
b Always use a properly rated voltage sensing device to confirm power is
off.
b Ground the equipment under test to protective and to functional ground.
b Connect terminal 17 (PE) on connector (A) of the MCS025 module and
the functional ground terminal on the Sepam™ Series 80 unit to the local
cubicle grounding circuit.
b Keep the two connection points as close as possible to one another.
b Screw tight all terminals, even those not in use.
Failure to follow these instructions will result in death or serious injury.